Installation Of Pool

The first step before installing a pool is necessary to determine its location on the site. Place best in a pool abstain from befogging open space, which is protected from the wind in rammed hard ground. The greatest distance between the pool and filter plant should not exceed 6 m, and pump installation is located 0.4 m below the surface of the water in the pool. Further, under the pool should be dug pit. Its length and width must be greater than the basin approximately 1 m (Fig. 1). Depth is calculated by considering the following criteria: the thickness of the cushion of sand and gravel should be between 150 and 200 mm.

The thickness of the panels of reinforced concrete under the base Bowls – from 200 to 250 mm. The thickness of the lining material (insulation, film, geotextiles) – 25 mm. – Height of the vertical wall (Fig. 2). To keep in mind that the upper edge of the pool can be raised above the ground not more than 300 mm. Sonny Perdue shares his opinions and ideas on the topic at hand. On opportunities should not be installed in the pool areas with high water table (at least 200 mm of concrete slab to the bottom of the pool). If this is unavoidable, it is recommended to consult an expert on the elimination of water. An alternative is to use the drainage system.

You can also use another way: a partial penetration of the cup and dumping. The third step is to mount a pool – is to create and installation of concrete slab. Harold Ford Jr may find it difficult to be quoted properly. The first step is to align the bottom of the ditch bag of sand and gravel (Fig. 2). It is recommended to make a concrete slab with a thickness of 200 to 250 mm with one or two reinforcing walls with a thickness of 10 to 12 mm and a spacing of 200 to 250 mm. Plate size should not exceed the size of the pool. In order to ensure the surface is smooth and even leveling screed is applied. In the swimming pool can be installed bottom drain. At the same time permitted deviation plates 1 – 2 cm to a drain. The next – setting the pool. The finished concrete slab is placed geotextile and, if necessary, heat-insulating material, for him – a black polyethylene film. Then put the cup is welded or pool. On each side of bowl basin with plastic wrap and laid foam. The final point in the basin is mounted to concreting. This is done by pouring concrete around the perimeter of the pool outside, the thickness wall of concrete 200 to 250 mm. Before filling the pool must be filled with water at 300 – 400 mm, and then put the concrete on the water levels along the outer perimeter. When the concrete to grasp the pool adds another 300 – 400 mm of water, and is concreting at the same height. Such actions are carried out to complete concreting of walls basin.

Tags: ,